The petitioners sought a faculty to remove four pews from the west end of the nave beneath the gallery, the doors and panelling to be salvaged for reuse; to introduce a new disabled accessible WC into the north-west corner, new cupboards into the south-west corner, and a kitchen into the base of the tower; to introduce a new upper floor into the tower with a balustrade to the west window and a new access door in the tower arch partition; to introduce a new foul drainage system on the site of the former underground boiler-house in the north-west re-entrant angle; and to reduce the base of the font by removing one step. The Georgian Group became a party opponent, objecting to the removal of some box pews to allow a disabled toilet to be built. The Chancellor granted a faculty: " ... although there will be a small loss to this historical and architectural heritage asset, the loss will be far outweighed by the benefit to the community."